Balloon the requirements that your inspection or first article inspection (FAI) process must account for and trace to verification evidence. Dimensions, geometric controls, and requirement-bearing notes are common examples. Do not treat every visible number as a separate acceptance characteristic: reference information, governing tolerance rules, datums, patterns, and process requirements need context. The customer, contract, and quality management system (QMS) procedure determine the final scope.
Ask three separate questions
Contents
“Should this get a balloon?” often combines three decisions that are easier to answer separately:
- Is it part of the design definition? Does it establish a product requirement or govern how another requirement is interpreted?
- Is it accountable in this inspection? Does the current inspection or FAI process require it to be verified or otherwise recorded?
- Where should the evidence live? Is a separate characteristic ID useful, or is the requirement grouped with another characteristic or documented in a certificate/process record?
This prevents a false choice between “balloon everything” and “ignore anything that is not a dimension.” Accountability can exist without a numeric measurement row.
Use an accountability matrix
The table is a starting point, not a substitute for a customer-specific inspection plan. “Usually” describes common practice; your governing requirements may differ.
| Source item | Design requirement? | Accountable in process? | Possible verification | Separate ID? | Possible evidence |
|---|---|---|---|---|---|
| Linear or angular dimension with tolerance | Yes | Usually, if in scope | Variable measurement | Usually | Numeric result and status |
| Limit dimension | Yes | Usually, if in scope | Variable measurement | Usually | Both limits and actual |
| Hole diameter and quantity | Yes | Usually | Size measurement; count | Depends on record structure | One or more results linked to pattern |
| Thread callout | Yes | Usually | Plug/ring gauge or specified method | Often | Class, size, depth and result as required |
| Geometric dimensioning and tolerancing (GD&T) feature-control frame | Yes | Usually, if applicable | Geometric evaluation | Often | Result and datum/control context |
| Datum feature symbol | Part of control context | Depends on inspection plan | Datum setup / reference | Not automatically | Record with the related control |
| Basic dimension | Yes; theoretically exact | Depends on FAI/customer procedure | Evaluate with related geometric control | Depends | Keep linked to the FCF and datums |
| Reference dimension | Usually informational | Usually not an independent acceptance item | Only if a governing reason exists | Usually no | Reference or conscious-review note |
| Surface finish | Yes when specified | Often, if in scope | Instrument or attribute method | Often when local/accountable | Numeric, verified state, or linked evidence |
| Edge break / deburr | Yes when specified | Often | Visual/attribute or measurement | Depends on global vs local note | Verified result and notes |
| General tolerance note | Governing rule | Yes, through dimensions it governs | Apply rule to each applicable dimension | Not one duplicate ID per decimal | Record tolerance source where useful |
| Material specification | Yes | Usually, but often outside dimensional table | Certificate / material verification | Procedure-dependent | Material or FAI record |
| Coating / heat treat / special process | Yes when required | Usually through defined evidence | Certificate, process record, or test | Procedure-dependent | Certificate ID or linked record |
| Projection method / scale | Usually drawing information | Usually not a product acceptance check | Document review if required | Usually no | Document-control review |
| Revision block | Document control | Always verify correct source revision | Controlled-document check | No characteristic ID by itself | Drawing number/revision in report header |
| BOM item / standard hardware | Context-dependent | Process-dependent | Count, identity, or supplier evidence | Depends on assembly scope | Assembly/material record |
Distinctions that prevent bad ballooning
Requirement vs. governing rule
A title-block tolerance rule can determine the allowed limits for many dimensions. It is a governing rule; the length or hole size it governs is the characteristic. Do not duplicate the title-block rule mechanically as a separate report row for every dimension. Record which rule was applied when that information helps another reviewer reproduce the interpretation.
Measured feature vs. datum reference
A datum feature establishes a reference for evaluating certain geometric controls. Its symbol is important context, but it is not automatically an independent characteristic to measure by itself. Follow the applicable inspection method and preserve the datum sequence when reporting a geometric result.
Quantity vs. requirement
“4X Ø8” says both how many features exist and what size is required. The team may create one ID with four results or a structured group of linked IDs. Do not lose the quantity while normalizing the text.
Measured vs. attribute or certificate evidence
Some requirements produce a measured value. Others are verified by appearance, documentation, or process records. A dimensional spreadsheet is not always the right place for every accountable item.
A five-question decision path
- Does this item define a product requirement or a governing rule?
- Is it within the scope of this inspection, FAI, or customer submission?
- What evidence will demonstrate that the requirement was addressed?
- Does the evidence need a unique characteristic ID to remain traceable?
- If it does not need its own row, where will the evidence be recorded?
If any answer is unclear, resolve it with the responsible quality engineer or customer before finalizing the drawing. Software can suggest a note or dimension, but it cannot determine which customer requirement governs your process. The BalloonForge review workflow lets the reviewer correct or reject candidates and add missed items; the reviewer still owns the scope decision.
Worked example: four-hole pattern
In the synthetic plate drawing, the callout “4X Ø8.0 ±0.1 THRU” sits beside a position control tied to datum references. A useful inspection plan preserves at least four things: the quantity, the size requirement, the geometric control and its datum context, and how the four locations will be evaluated. The report can group or split these into records, but it should make clear which result belongs to which feature and control.

Standards and customer scope
AS9102 addresses how a first article inspection (FAI) is performed and documented; it should not be reduced to a one-line rule about whether a shop must draw circles around every feature. IAQG publishes Rev C forms and supporting material, while a customer, contract, or internal quality procedure may add specific documentation requirements.
For geometric dimensioning and tolerancing, use the edition of ASME Y14.5 or other standard specified by the drawing or contract. The ASME Y14.5 overview describes the standard’s role in stating and interpreting GD&T; it does not replace the licensed standard or a trained interpretation.
Frequently asked questions
Should every dimension have a balloon?
Not as a universal rule. Identify the requirements that the inspection process must account for, then apply the customer and QMS procedure.
Do reference dimensions get measured?
They are generally informational, not independent acceptance limits. If a contract or internal procedure requires special treatment, document the reason and follow it.
Do basic dimensions have their own tolerance?
A basic dimension is theoretically exact; a related geometric control supplies the tolerance context. Do not convert it into an ordinary plus/minus limit unless the source and governing standard support that interpretation.
Do notes belong in a dimensional report?
Some notes establish requirements, but the correct evidence may be an attribute check, certificate, or process record.
Further reading
Free engineering resource
Drawing Inspection Starter Kit
An editable Excel report template, a printable drawing-review checklist, and a guide to connecting drawing requirements with inspection results.
ZIP · Excel template and printable HTML guides
Enter your email and submit the form to unlock your download.